SW Marcile Lane Water Main Installation

TVWD will install a new section of water main along SW Marcille Lane to connect two sections of the water system together. Construction is scheduled to begin July 15 and will take four to eight weeks to complete.

What is TVWD doing?Marcile Lane

This project includes installation of approximately 500 feet of a new water main to connect separate sections of the water system and better serve customers in the surrounding areas.

How can I stay informed?

Please sign up here to receive timely updates via email.

Additional notifications will be delivered via email, automated phone calls, or by door-hanger.

What Is the Timeline?

Construction is scheduled to begin July 15. The construction process is expected to take four to eight weeks, followed by final road paving.

Please note that timelines are subject to change due to a variety of factors.

Why now?

Connecting these two sections of the water system will help water flow more continuously and add redundancy to the system serving this area. These sections were not originally connected due to previous development and permitting regulations.

Connecting these sections of the water system helps provide reliable water service into the future and provides greater fire protection coverage.

How does this affect me?

Depending on your property type and use, this project will affect you in different ways and times:

Working Times

Work will occur between the hours of 8 a.m. to 5 p.m., Monday through Friday. Work may periodically occur outside of these times if approved by Washington County.

Traffic Disruptions

Vehicular and pedestrian access within the project area will be limited at times during construction. TVWD will work to maintain access to driveways throughout the project. Temporary driveway access may be provided by placing steel plates over the exposed work areas while that section is being installed and/or connected, typically lasting one day.

This project will include times when the intersections on SW Marcile Lane and SW 165th Avenue will be limited to one lane or controlled by flaggers.

General Construction Disruptions

During construction, heavy equipment and materials will be located in the work area. These areas will be clearly marked with cones and/or caution tape. When construction is occurring, noise and dust will be present.

Water Service Disruptions

There are no planned water service disruptions for this project.

Updated July 2, 2019