NW 153rd Ave Water Main Replacement

TVWD will replace a section of water main along NW 153rd Avenue in the Oak Hills neighborhood. Construction is scheduled to begin this summer and will take approximately four to six weeks to complete.

What is TVWD doing?153-Oak Hills

This project includes installation of approximately 500 feet of a new water main to better serve customers along this stretch of NW 153rd Avenue.

How can I stay informed?

Please sign up here to receive timely updates via email.

Additional notifications will be delivered via email, automated phone calls, or by door-hanger.

What Is the Timeline?

Construction is scheduled to begin in summer 2019. The construction process is expected to take approximately four to six weeks, followed by final road paving.

Please note that timelines are subject to change due to a variety of factors.

Why now?

The existing water main is deteriorating, with previous leaks and is a priority replacement project.

Upgrading this water main helps provide reliable water service into the future, reduces the chance of leaking and broken water mains, and provides greater fire protection coverage.

How does this affect me?

Depending on your property type and use, this project will affect you in different ways and times:

Working Times

Work will occur between the hours of 8 a.m. to 5 p.m., Monday through Friday. Work may periodically occur outside of these times if approved by Washington County.

Traffic Disruptions

Vehicular and pedestrian access within the project area will be limited at times during construction. TVWD will work to maintain access to driveways throughout the project. Temporary driveway access may be provided by placing steel plates over the exposed work areas while that section is being installed and/or connected, typically lasting one day.

This project will include times when the intersections on NW Oak Hills and NW 153rd Avenue will be limited to one lane or controlled by flaggers.

General Construction Disruptions

During construction, heavy equipment and materials will be located in the work area. These areas will be clearly marked with cones and/or caution tape. When construction is occurring, noise and dust may be present.

Water Service Disruptions

Once the new water main is installed, individual water services will be connected to the new line. Your water will be temporarily turned off for 15 to 30 minutes to connect your home to the new main.

When the entire project is complete, TVWD will disconnect the original water main from the system. That process requires a service disruption of four to six hours.

Water service disruptions are scheduled in the middle of the day when most residents are away from home. It is TVWD's goal to minimize the water service disruption time for all customers. You will be notified at least 48 hours in advance when service disruptions are planned.

Updated April 15, 2019